Case Study : Lime Chemicals Plant

Installation Information

Industry Type

Lime Chemicals

Location

Paonta Sahib, Himachal Pradesh. India

Installed & Commissioned

December 2005

Power Utilization Scheme

Sychronized with Plant Grid

Brief Scheme

Operating Data

  Before the Turbine Installation After the Turbine Installation

Boiler Steam Generation

6 TPH @ 10 bar

6 TPH @ 32 bar 320oC

Grid Power Consumption

350 kWh

25 kWh

Turbine Power Generation

0 kWh

325 kWh

Total Power Generation

350 kWh

350 kWh

Cost of  Power from Grid

Rs. 3.50 / kWh

Rs. 3.50 / kWh

Operation days per annum

300 days

300 days

Cost of Power Drawn per annum

Rs. 88.20 Lakhs

Rs. 6.30 Lakhs

Gross Savings Per annum

Rs. 81.90 Lakhs

No of Turbine Operators Nil (virtually unmanned operation)
Maintenance Cost per Annum Rs. 1.00 Lakhs
Cost of Additional Fuel Rs. 16.00 Lakhs
Total Operation & Maintenance Rs. 17.00
Net Savings per Annum Rs. 64.90 Lakhs
% Power Cost Saving 73.50%